You are connecting from Lake Geneva Public Library, please login or register to take advantage of your institution's Ground News Plan.
Published 1 hour ago • loading... • Updated 56 minutes ago
Former St. Mary's Residential School in Mission to be demolished
The Stó:lō Collective says hazardous materials and deteriorating buildings make the site unsafe, and a proposed Interpretive Centre is planned for 2028.
The Mary Residential School on Lougheed Highway in Mission is scheduled for full demolition in 2027. According to a notice from the Collective shared on Sept 5, a proposed Interpretive Centre is projected to open on the site in 2028.
Deteriorating buildings exposing hazardous materials prompted the Collective to order full deconstruction for safe future reuse. Structures "represent a system that caused deep and lasting harm" to Indigenous children over 121 years of operation.
Operating for 121 years across three Mission locations, Mary Residential School was the province's longest-running such institution. The final site, known as Pekw, is shared by 21 communities comprising the Collective.
Tenants received lease termination letters in 2024 as demolition plans progressed. The Collective confirmed that Cultural protocols will be followed prior to deconstruction, with events scheduled for Cultural gatherings.
Canada committed $100.1 million in 2021 to support community plans for remediating former Residential School sites nationwide. With environmental reports complete, the Collective is guiding the land's preparation based on community priorities rather than erasure.