Published • loading... • Updated
For the next two years, plan on lane closures at U.S. 17 bridge
Summary by Coastal Review Online
1 Articles
1 Articles
For the next two years, plan on lane closures at U.S. 17 bridge
The preservation work is part of routine maintenance to maximize the lifespan of the structure. Map: NCDOT The North Carolina Department of Transportation said this week that it will conduct continuous lane closures on a major Beaufort County bridge over the next two years. On Monday, crews are to begin preservation work along a portion of U.S. Highway 17 that connects Washington to Chocowinity. The 16-year-old bridge crosses over U.S. 17 Busine…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
