Published • loading... • Updated
Flower Stand To Remain On Česká After Agreement Reached With Operator
Summary by Brno Daily
1 Articles
1 Articles
Flower Stand To Remain On Česká After Agreement Reached With Operator
Work on the construction of the collector under Česká is still ongoing, affecting the intersection of Česká, Veselá and Solniční in front of the Convalaria building. A temporary steam pipeline is being relocated at the site, and workers will also have a newly equipped construction site. The flower stand, which was scheduled to be removed, will now be moved to a more suitable location after a joint agreement between Brno Technical Networks (‘Tech…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
