After repeated flooding forced the closure of Flossmoor’s Dartmouth Pedestrian Bridge, the Village Board approved an additional $46,800 in engineering services at its July 20 meeting to redesign the replacement bridge so it can better withstand future flood events. The amendment to the village’s engineering contract with Baxter & Woodman expands the project’s scope after survey work revealed the bridge’s current elevation leaves it vulnerable to…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.