Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Five New Bus Lines From October 1st - The Areas They Will Cover

Summary by in.gr
With the start of the winter program, on September 11, the frequencies of fixed-track means of transport - Metro, Electric and Tram - were also modified during peak hours The post Public Transport: Five new bus lines from October 1st - The areas they will cover appeared first on in.gr.

20 Articles

Lean Left

With the start of the winter program, on September 11, the frequencies of fixed-track means of transport - Metro, Electric and Tram - were also modified during peak hours The post Public Transport: Five new bus lines from October 1st - The areas they will cover appeared first on in.gr.

·Greece
Read Full Article
Right

What are the 5 new lines added to the 15 standard lines already in operation?

·Marousi, Greece
Read Full Article
Lean Right

A 13.6% reduction in peak hour travel times was recorded on the 15 standard lines of the OASA in the first half of 2026 compared to the corresponding period in 2025. As indicated in a relevant announcement by the Ministry of Infrastructure and Transport, this is a substantial upgrade of the operation of the lines with more frequent vehicle passage and reduced waiting time for passengers. More frequent bus passage, less waiting The performance of…

The number of standard bus lines is increasing from 15 to 20 and their reinforcement with additional vehicles. Waiting time at bus stops will be shorter for hundreds of thousands of passengers as the Ministry of Infrastructure and Transport proceeds with the expansion of the program with standard bus lines, especially during peak hours. In fact, on the first 15 standard lines of OASA in the first half of 2026, a significant reduction of 13.6% in…

Read Full Article

OASA is proceeding with the expansion of the program from 15 to 20 bus lines from October 1, based on the positive result of the first phase. In detail, the 15 model lines of the first phase are: 3 Nea Filadelfia – ‘Ano Patisia – Neo Psychiko 5 Lambrini – Syntagma – Tzitzifies 14 Lambrini – Alexandras Avenue – […]

The five new lines will be reinforced with additional vehicles, so that the benefit can be extended to a larger part of the network.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 67% of the sources lean Right
67% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

insider.gr broke the news on Wednesday, September 23, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal