First spillway gate removed at Center Hill Dam for replacement
Summary by DVIDS
1 Articles
1 Articles
First spillway gate removed at Center Hill Dam for replacement
LANCASTER, Tenn. (July 28, 2025) – Work crews at Center Hill Dam removed the first of its massive spillway gates Saturday, a pivotal first step for an ongoing project to replace all eight original tainter gates and lifting equipment that have been in continuous operation since 1948.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium