First Solar Inaugurates ‘AI-Powered’ 3.5GW Louisiana Factory
8 Articles
8 Articles
First Solar Unveils USD 1.1 bn Louisiana Manufacturing Facility
First Solar, Inc. recently inaugurated its new fully vertically integrated manufacturing facility in Iberia Parish, Louisiana. The USD 1.1 billion facility, which spans approximately 2.4 million square feet and is about 11 times the size of the New Orleans Superdome, currently employs over 700 people and is expected to have 826 employees by the end of the year. Once fully ramped, the Iberia Parish facility is expected to add 3.5 gigawatts (GW) o…
First Solar inaugurates $1.1B Louisiana manufacturing facility
Once fully ramped, the Iberia Parish facility is expected to add 3.5 GW of annual nameplate capacity, taking First Solar’s American manufacturing footprint to 14 GW in 2026, and 17.7 GW in 2027, when its production facility in South Carolina is expected to be fully ramped.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

