Published • loading... • Updated
First phase of technical study assessing existing damage to Zumurrud Mall project completed
Summary by Libya Herald
1 Articles
1 Articles
First phase of technical study assessing existing damage to Zumurrud Mall project completed
Al-Bunyan Engineering Consulting Company reported last Monday (16 February) that over the past few months it had completed the first phase of a technical study assessing existing damage at the Zumurrud (Emerald) Shopping Mall Investment Project. The project is part of the Tripoli Gate (Bab Trabulus) Project implemented by the Libyan Investment Development Company LIDCO […] The post First phase of technical study assessing existing damage to Zumu…
·Tripoli, Libya
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

