Published • loading... • Updated
First phase of Readsboro bridge replacement almost complete
Summary by Deerfield Valley News
2 Articles
2 Articles


First phase of Readsboro bridge replacement almost complete
READSBORO — The temporary bridge needed for the replacement of the Readsboro bridge is near installation after construction began earlier this spring, according to VTrans Project Manager Jonathan Griffin. The temporary bridge will carry traffic and sewer pipes across the Deerfield River while the existing bridge is removed and reconstructed.
·Wilmington, United States
Read Full ArticleCoverage Details
Total News Sources2
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium