Skip to main content
See every side of every news story
Published loading...Updated

First Hybrid Park in the Mittelburgenland in Operation

Summary by Kronen Zeitung
In Deutschkreutz wind and sun are now used at one site. The energy generated there can be used to supply 9500 households. The seven old wind turbines in Deutschkreutz have been dismantled and replaced by two larger and more powerful wind turbines, which are 244 metres high and weigh 60 tonnes each. A biodiversity photovoltaic system has now been integrated into the existing wind farm to generate solar energy on an area of ten hectares – a premie…

1 Articles

Right

In Deutschkreutz wind and sun are now used at one site. The energy generated there can be used to supply 9500 households. The seven old wind turbines in Deutschkreutz have been dismantled and replaced by two larger and more powerful wind turbines, which are 244 metres high and weigh 60 tonnes each. A biodiversity photovoltaic system has now been integrated into the existing wind farm to generate solar energy on an area of ten hectares – a premie…

·Vienna, Austria
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Kronen Zeitung broke the news in Vienna, Austria on Sunday, August 31, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal