Complete the main works of burial of the railway line that crosses Ferrara, with the static tests of the new gallery and the installation of the tracks both on the director Rimini-Ferrara, and on the Ferrara-Codigoro. With an investment of 66,8 million euros has been completed the new railway gallery of 850 meters (in the photo) and two new urban stops (Via del Bove and Piazzale Red Shirts). In autumn, the railway traffic will be transferred in …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Complete the main works of burial of the railway line that crosses Ferrara, with the static tests of the new gallery and the installation of the tracks both on the director Rimini-Ferrara, and on the Ferrara-Codigoro. With an investment of 66,8 million euros has been completed the new railway gallery of 850 meters (in the photo) and two new urban stops (Via del Bove and Piazzale Red Shirts). In autumn, the railway traffic will be transferred in …