Published • loading... • Updated
Feds eye new option for Michigan Line 5: No concrete tunnel, horizontal drilling
Summary by Bridge Michigan
1 Articles
1 Articles
Feds eye new option for Michigan Line 5: No concrete tunnel, horizontal drilling
As it weighs the fate of Line 5, the US Army Corps of Engineers is quietly pitching a major alternative: Rather than moving the pipeline into a concrete tunnel, Enbridge could use ‘horizontal directional drilling’ to place it into a much narrower borehole.
Coverage Details
Total News Sources1
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
