Skip to main content
Black Friday Sale - Get 40% off Vantage
Published loading...Updated

Feds eye new option for Michigan Line 5: No concrete tunnel, horizontal drilling

Summary by Bridge Michigan
As it weighs the fate of Line 5, the US Army Corps of Engineers is quietly pitching a major alternative: Rather than moving the pipeline into a concrete tunnel, Enbridge could use ‘horizontal directional drilling’ to place it into a much narrower borehole.

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Bridge Michigan broke the news in on Friday, November 21, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal