Skip to main content
See every side of every news story
Published loading...Updated

Farmington downtown improvements given preliminary review

Farmington's downtown area. Photo by Ben Hanstein.FARMINGTON — The Select Board reviewed $1.5 million in proposed upgrades to Main Street and Hippach Field this week, as part of a multiphase project to improve safety and access in downtown Farmington. Preliminary plans include new granite curbing and islands; 5-foot-wide sidewalks that comply with the Americans with Disabilities Act; changes to the traffic flow through the Intervale; and install…

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

The Maine Monitor broke the news in on Saturday, November 1, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal