Extension of the High-Speed Line: the Market for Technical Controls Launched
Summary by leseco.ma
1 Articles
1 Articles
All
Left
Center
Right
Nearly 5 MDHs will be mobilised by ONCF for technical control and optimization of studies and work related to the construction project of the Kenitra-Marrakech LGV maintenance stations and technical centres. The post Extension of the high-speed line: the market for technical controls launched appeared first on LesEco.ma.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium