Explosion Work for Power Plant in Forbach Is Faster than Planned
Summary by Badische Neueste Nachrichten
1 Articles
1 Articles
The blasting work for the new pumped storage power plant in Forbach is better than planned: 900,000 tons of rock are already removed from the mountain.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium