ETDCO board lauds progress of Tabora–Katavi power transmission project
Summary by The Citizen
2 Articles
2 Articles
All
Left
Center
Right
ETDCO board impressed by power transmission project – Daily News
TABORA: THE Board of Directors of the Electricity Transmission and Distribution Construction and Maintenance Company (ETDCO) has expressed satisfaction with the effective management of the 132-kilovolt power transmission project from Tabora to Katavi. Speaking in Tabora Region during an inspection tour of the project, the Board Chairman, Mr Raymond Mbilinyi, said that the project’s progress is satisfactory, adding that by the end of June this ye…
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium