Environmental – Walkway – Seasonal float
Where (1) a plaintiff sought approval from the conservation commission of Barnstable to replace a walkway and (2) the commission approved the application but imposed conditions on the use of an existing seasonal float that was connected to the walkway by a seasonal ramp, the commission exceeded its authority by imposing conditions on the use of the float that were unrelated to the scope of the proposed work to the walkway.