Published • loading... • Updated
Engineering firm presents Longboat road-raising, drainage plans
Summary by Your Observer
1 Articles
1 Articles
Engineering firm presents Longboat road-raising, drainage plans
During king tides in the Sleepy Lagoon neighborhood, water starts to bubble up from the storm drain grates, rain or not.“It’s supposed to go down the drain and go somewhere else,” Juan Anasco Drive resident Bob Krosney said. “Well, not when the tide is high. It’s got no place to go.”At a public meeting, civil engineering firm HR Green and the town of Longboat Key shared engineering plans to combat stormwater drainage on Juan Anasco, De Narvaez a…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium

