Engineering a better future
Summary by Lesotho Times
1 Articles
1 Articles
Engineering a better future
THE design and construction of the Polihali Dam, focusing on structural integrity, materials and seismic considerations Nestled in the rugged highlands of Lesotho in Mokhotlong, approximately one kilometre downstream of the confluence of the Khubelu and Senqu (Orange) rivers, the Polihali Dam which will create a reservoir capable of storing 2,325 million cubic metres […]
·Maseru, Lesotho
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium