EnergyPathways Appoints Jacobs to Advance MESH Energy Storage Project
4 Articles
4 Articles
Jacobs to support regulatory and consenting strategy for UK’s MESH Energy Storage Project
Jacobs has been selected by EnergyPathways plc to provide consenting, regulatory and key Development Consent Order (DCO) activities for the MESH Energy Storage Project, a major long-duration energy storage scheme designed to strengthen UK energy [read more...]
08/09/2026 - energysdelamer.eu. EnergyPathways PLC (AIM: EPP) has appointed the Jacobs engineering group as its engineering and regulatory partner for the MESH long-term energy storage project in the Irish Sea, near Barrow-in-Furness.
EnergyPathways Appoints Jacobs to Advance MESH Energy Storage Project
EnergyPathways PLC (AIM: EPP) has appointed engineering group Jacobs as its tier-one engineering and regulatory partner for the MESH long-duration energy storage project in the Irish Sea, near Barrow-in-Furness. JacobsRead More...
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium






