Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

ENERGY – Jirama Accounts for up to 30 MW of Electricity Production Deficit and Refers to Emergency Measures

A significant drop in water level that makes Andekaleka run. Technical incidents at the level of a combustion turbine in Ambohimanambola. An alternator of the DG2d'Afripower group in Mandroseza out of service. The Jirama evokes several factors to explain the lack of electricity generation on the interconnected network of Antananarivo (RIA). Emergency measures such as operations [...] The article ENERGY – The Jirama reports up to 30 MW of electri…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

A significant drop in water level that makes Andekaleka run. Technical incidents at the level of a combustion turbine in Ambohimanambola. An alternator of the DG2d'Afripower group in Mandroseza out of service. The Jirama evokes several factors to explain the lack of electricity generation on the interconnected network of Antananarivo (RIA). Emergency measures such as operations [...] The article ENERGY – The Jirama reports up to 30 MW of electri…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

2424.mg - L'actualité quotidienne en temps réel broke the news on Wednesday, September 9, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal