Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

"Only God Saves Us From the crisis." Chief of My Federation Energy: "You Can't Speed up Coal, but Wait for Low prices."

Summary by Digi 24
Dumitru Pîrvulescu, President of the National Federation of Mines Energy, criticized on Wednesday, live at Digi24, the policy of accelerated reduction of coal capacity. The official argues that Romania risks facing increasing problems in energy security and stressed that maintaining coal groups in operation is necessary for the safety of the National Energy System until new production capacities are developed. "Until we do reactors 3 and 4 at Ce…

6 Articles

Center

Dumitru Pîrvulescu, President of the National Federation of Mines Energy, criticized on Wednesday, live at Digi24, the policy of accelerated reduction of coal capacity. The official argues that Romania risks facing increasing problems in energy security and stressed that maintaining coal groups in operation is necessary for the safety of the National Energy System until new production capacities are developed. "Until we do reactors 3 and 4 at Ce…

·Bucharest, Romania
Read Full Article
Lean Right

The energy crisis causes the government to abandon the closure of the Turkish and Craiova coal groups at the end of the month, which it had assumed through the National Recovery and Resilience Plan of Romania (PNRR). This will mean the loss of European funds, which is expected to be as little as possible. Article The energy crisis obliges Romania to stop closing, at the end of the month, the Turkish and Craiova coal groups. How much money from t…

Right

The government is preparing to give up, at least for the moment and in part, the closures of coal capacity assumed by the PNRR. The decision comes at a time when the energy system is facing increasing problems, and the authorities consider that keeping groups in operation is necessary to limit risks in the cold season.

Romania requested the European Commission and the European Network of Transport Operators (ENTSO-E) to carry out an updated regional assessment on the capacity of the energy systems in the region to cope with a possible worsening of the energy situation in Romania, announced on Tuesday the Secretary of State for Energy Cristian Bușoi. The assessment was requested with a view to stopping Unit 2 in Cernavoda. The European Commission maintains, how…

Romania is preparing to notify the European Union that it is delaying the decarbonisation of its energy system, invoking the crisis caused by the prolonged drought and the dramatic decline in the Danube flow. This development reveals one of the biggest problems of the European energy transition: climate change, which attempts to solve the abandonment of fossil fuels, simultaneously causes extreme events that [...]

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 67% of the sources lean Right
67% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

rador.ro broke the news on Monday, August 10, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal