Published • loading... • Updated
Enel completes 556-MW solar array co-located at operational 355-MW BESS
Summary by Solar Power World
1 Articles
1 Articles
Enel completes 556-MW solar array co-located at operational 355-MW BESS
Enel North America completed its largest power plant in the United States with the start of operations of the 556-MWDC GulfStar solar plant in Wharton County, Texas. It is co-located with an operational 355-MW battery energy storage system (BESS), which reached initial commercial operation in late 2024. The GulfStar solar and BESS facilities are expected… The post Enel completes 556-MW solar array co-located at operational 355-MW BESS appeared f…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
