Drivers on QEW in Ontario should prepare for several lane closures
Summary by Insauga
1 Articles
1 Articles
Drivers on QEW in Ontario should prepare for several lane closures
Lane closures on the Burlington Skyway start tonight…and there will be more than usual. Construction on the bridge that takes QEW traffic over Hamilton Harbour begins tonight (Aug. 15) at 10 p.m. and will continue until Monday, Aug. 18, at 5 a.m. During this time, the westbound lanes heading to Niagara on the bridge will be reduced to two lanes. As well, all Niagara-bound lanes will be closed on the Skyway on Saturday, Aug. 15, from 1 to 3 a.m. …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium