Published • loading... • Updated
Drinking Water Project in Sacacoyo Leads 97 % Progress
Summary by Diario Digital Cronio De El Salvador
1 Articles
1 Articles
The Directorate of Municipal Works (DOM) reported that the second phase of the drinking water project that is carried out in the district of Sacacoyo, in the municipality of La Libertad Oeste, carries a 97 % advance. To complete the work in its entirety, the DOM executes the last details that consist of the [...] The post Drinking water project in Sacacoyo carries 97 % advance appeared first on Diario Digital Cronio de El Salvador.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
