Ciudad Juárez.- An obstruction in the drainage network of the avenue Juárez caused accumulation of water in the step to unevenness of the 16th of September avenue, so personnel of Civil Protection and of the Municipal Board of Water and Sanitation (JMAS) began work of desazolve to avoid new stagnations in the area. The general director of Civil Protection, Sergio Rodríguez, reported that the work began from Saturday, after detecting flood proble…
Ciudad Juárez.- An obstruction in the drainage network of the avenue Juárez caused accumulation of water in the step to unevenness of the 16th of September avenue, so personnel of Civil Protection and of the Municipal Board of Water and Sanitation (JMAS) began work of desazolve to avoid new stagnations in the area. The general director of Civil Protection, Sergio Rodríguez, reported that the work began from Saturday, after detecting flood proble…