DPWH FINISHES GUIMBA FLOOD CONTROL PROJECT
2 Articles
2 Articles
The Department of Public Works and Highways (DPWH) has completed the ₱47.8-million flood control project along the Rio Chico River in Barangay Macamias, Guimba, Nueva Ecija. Based on a report by DPWH Region 3 Director Roseller A. Tolentino to Secretary Manuel M. Bonoan, the project will help strengthen the community’s ability to withstand the effects of severe flooding in the area. The Rio Chico River often overflows during heavy rains, often e…
DPWH FINISHES GUIMBA FLOOD CONTROL PROJECT
The Department of Public Works and Highways (DPWH) completed a vital flood control project structure along the Rio Chico River in Barangay Macamias, Guimba, Nueva Ecija – bolstering the community’s resilience against flooding. The P47.8-million project, completed in 2-phases, involves the installation of flood control structures such as steel sheet piles, concrete beam coping, and gabions, designed to enhance structural integrity and resist wate…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium