institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

DPWH FINISHES GUIMBA FLOOD CONTROL PROJECT

Summary by IKOT.PH
The Department of Public Works and Highways (DPWH) completed a vital flood control project structure along the Rio Chico River in Barangay Macamias, Guimba, Nueva Ecija – bolstering the community’s resilience against flooding. The P47.8-million project, completed in 2-phases, involves the installation of flood control structures such as steel sheet piles, concrete beam coping, and gabions, designed to enhance structural integrity and resist wate…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

All
Left
Center
Right

The Department of Public Works and Highways (DPWH) has completed the ₱47.8-million flood control project along the Rio Chico River in Barangay Macamias, Guimba, Nueva Ecija.  Based on a report by DPWH Region 3 Director Roseller A. Tolentino to Secretary Manuel M. Bonoan, the project will help strengthen the community’s ability to withstand the effects of severe flooding in the area. The Rio Chico River often overflows during heavy rains, often e…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

IKOT.PH broke the news in on Thursday, May 29, 2025.
Sources are mostly out of (0)