Published 5 days ago • loading... • Updated 5 days ago
Construction Begins on New NYSDOT Materials Testing Lab
Summary by WTEN
2 Articles
2 Articles
DOT breaks ground for new lab on Harriman campus
The 114,500-square-foot lab, all in one building, will accommodate new testing equipment and will operate on electric power, using geothermal energy to heat and cool the building with wellfields extending 800 feet below the surface.
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center1Last Updated100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium








