institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Dispute over Infrastructure: German Lng Terminal Ship Leased – Stade Energy Site Abandoned - Epoch Times (German)

Summary by epochtimes.de
According to plans by the Federal Ministry of Economics, the LNG unloading port in Stade was supposed to begin operations at the turn of the year 2023/24. Disputes over the unloading infrastructure have so far hampered the operation of the floating LNG terminal "Energos Force." The ship is now on its way to Jordan.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

According to plans by the Federal Ministry of Economics, the LNG unloading port in Stade was supposed to begin operations at the turn of the year 2023/24. Disputes over the unloading infrastructure have so far hampered the operation of the floating LNG terminal "Energos Force." The ship is now on its way to Jordan.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

epochtimes.de broke the news in on Tuesday, July 15, 2025.
Sources are mostly out of (0)

You have read 1 out of your 5 free daily articles.