A developer in downtown Sudbury was temporarily ordered to stop work when polystyrene pellets escaped their construction zone and littered the streets of Sudbury. Advocates are concerned that the damage to waterways is already done, with microplastic runoff from the polystyrene taking hundreds of years to decompose.