Council approves South Palm Canyon flood control bridge project with federal funding deadline looming ⋆ The Palm Springs Post
Summary by The Palm Springs Post
1 Articles
1 Articles
Council approves South Palm Canyon flood control bridge project with federal funding deadline looming ⋆ The Palm Springs Post
A rendering of what a bridge planned for South Palm Canyon Drive near the intersection with East Bogert Trail might look like. The project is being constructed to help deal with heavy rains that often flood the roadway, cutting off hundreds of homes. The Palm Springs City Council voted 3-0 Monday night to approve a $10 million flood control bridge project on South Palm Canyon Drive, rejecting an alternative design proposed by environmental group…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium