Corps revises Pearl River flood study, sets new comment period
JACKSON, MISSISSIPPI, JUL 9 – The U.S. Army Corps of Engineers presents two flood control proposals for Pearl River with costs up to $918 million and opens public comment through Aug. 18.
Summary by Daily Journal
6 Articles
6 Articles

+4 Reposted by 4 other sources
Corps revises Pearl River flood study, sets new comment period
The U.S. Army Corps of Engineers released a revised study on potential flood controls for the part of the Pearl River in Mississippi that runs along Jackson.
·United States
Read Full ArticleCoverage Details
Total News Sources6
Leaning Left1Leaning Right0Center1Last UpdatedBias Distribution50% Left, 50% Center
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
50% Center
L 50%
C 50%
Factuality
To view factuality data please Upgrade to Premium