institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

National Electrical Coordinator Presents Plan to Strengthen the Security of the System and Avoid New Blackouts

Summary by pnt.cl
The plan considers a series of strategic initiatives organized in four areas: prevention, containment, rapid recovery of service and continuous learning.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

4 Articles

The plan considers a series of strategic initiatives organized in four areas: prevention, containment, rapid recovery of service and continuous learning.

Researchers from the University of Jaén (UJA) and the Carlos III of Madrid have developed the first database on solar, wind and hydraulic power generation in Spain, a tool that will facilitate the planning of an electrical system nationwide. The tool, called Shirenda, has been developed by researchers from the Physics Department of the University of Jaén (UJA) and the Department of Informatics of the University Carlos III of Madrid (UC3M). It ha…

Together with a series of actions that have already been carried out, the plan considers other measures derived from post-February 25 learning. In fulfilment of his role as a technical and independent body responsible for the safe operation, at minimal cost and with open access to the National Electrical System (SEN), the National Electrical Coordinator presented a plan with measures and recommendations to strengthen the security of the Chilean …

In fulfilment of his role as a technical and independent body responsible for the safe operation, at minimal cost and with open access to the National Electrical System (SEN), the National Electrical Coordinator presented a plan with measures and recommendations to strengthen the security of the Chilean electrical system, after the blackout that affected much of the country on February 25. The event, which involved a total disconnection of the s…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

revistaei.cl broke the news in on Tuesday, July 22, 2025.
Sources are mostly out of (0)

Similar News Topics