Construction Work Begins on the Coastline Destroyed by December Storm Surges - Diario La Quinta
Summary by Diario La Quinta De Valparaíso
1 Articles
1 Articles
All
Left
Center
Right
With an investment of more than $2.45 billion, contributed by the Ministry of Public Works through the Directorate of Port Works, the construction of the definitive wall of the coastal edge of Algarrobo began, which was seriously damaged in December 2024 by strong waves. The regional minister […] The post [ALGARROBO] Construction work begins on the coastal edge destroyed by December waves first appeared on Diario La Quinta.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium