Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Construction Cost in Mendoza: up to 2.33% in October with Rises in Materials Linked to the Dollar

The Mendoza Engineering Center, through its monthly measurement, reported that the overall cost of construction recorded an increase of 2.33% in October, exceeding the averages of previous months. Daniel Dimaria, president of the entity, explained that this increase is due to a strong rise in labor and, mainly, to sudden jumps in materials sensitive to the exchange rate.«The report details that only the cost of materials increased on average by …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

The Mendoza Engineering Center, through its monthly measurement, reported that the overall cost of construction recorded an increase of 2.33% in October, exceeding the averages of previous months. Daniel Dimaria, president of the entity, explained that this increase is due to a strong rise in labor and, mainly, to sudden jumps in materials sensitive to the exchange rate.«The report details that only the cost of materials increased on average by …

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

diariosanrafael.com.ar broke the news in on Wednesday, October 15, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal