Works of connection between Substation Electric High Voltage User (sse at u) and Cabin of Distribution Primary in medium voltage. Municipality of Gioia Tauro (RC). Contracting entity: Authority of Harbour System of the Southern Tyrrhenian Seas and Ionian. Amount: 2,815.605 € Deadline: 7/10/2026 Call (pdf) Bands of the day Archive Bands For tenders in [...] The post Connection between Substation Electric and Cabin of Distribution to Gioia Tauro (…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Works of connection between Substation Electric High Voltage User (sse at u) and Cabin of Distribution Primary in medium voltage. Municipality of Gioia Tauro (RC). Contracting entity: Authority of Harbour System of the Southern Tyrrhenian Seas and Ionian. Amount: 2,815.605 € Deadline: 7/10/2026 Call (pdf) Bands of the day Archive Bands For tenders in [...] The post Connection between Substation Electric and Cabin of Distribution to Gioia Tauro (…