Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Combined releases at 500 cfs at Jamestown, Pipestem reservoirs

Summary by Jamestown Sun
JAMESTOWN — Combined releases at Jamestown and Pipestem reservoirs are at 500 cubic feet per second, according the U.S. Army Corps of Engineers. Releases at Pipestem Reservoir were increased by 100 cfs from 100 to 200 cfs. The Corps of Engineers said releases were increased at Pipestem Reservoir to slowly lower the pool elevation which is at 1,461.7 feet above mean sea level. Releases at Jamestown Reservoir remain at 300 cfs. Release at Jamestow…

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Jamestown Sun broke the news on Monday, May 11, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal