Published • loading... • Updated
Colorado I-70 mountain corridor project to impact traffic from Gypsum to Eagle starting in April
Summary by Vail Daily
3 Articles
3 Articles
+2 Reposted by 2 other sources
Colorado I-70 mountain corridor project to impact traffic from Gypsum to Eagle starting in April
A project to resurface Interstate 70 between Gypsum and Eagle will begin on Monday, April 6, weather permitting. The about 8-mile resurfacing project from Mile Point 139, just west of Gypsum, to Exit 147 to Eagle is expected to result in “minimal delays,” but will require a speed reduction to 55 mph and single-lane closures throughout the summer, according to a news release. The westbound I-70 off-ramp at Exit 147 will be widened as part of the …
Coverage Details
Total News Sources3
Leaning Left0Leaning Right0Center3Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium



