See every side of every news story
Published loading...Updated

CNOOC Limited Announces Buzios7 Project Commences Production

  • CNOOC Limited announced that the Buzios7 Project has commenced production safely on February 16, 2025.
  • The Buzios oilfield, the largest deep-water pre-salt oilfield, is located in Brazil's Santos Basin, and production is expected to reach up to 1 million barrels per day in the second half of 2025.
  • Buzios7 includes the production of 15 development wells and utilizes one of the largest Floating Production, Storage, and Offloading units worldwide.
  • CNOOC Petroleum Brasil Ltda holds a 7.34% interest in the Buzios Shared Reservoir, while Petrobras holds 88.99% interest.
Insights by Ground AI
Does this summary seem wrong?

48 Articles

All
Left
4
Center
15
Right
3
The Conway Daily SunThe Conway Daily Sun
+43 Reposted by 43 other sources

CNOOC Limited Announces Buzios7 Project Commences Production

HONG KONG, Feb. 16, 2025 /PRNewswire/ -- CNOOC Limited (the "Company", SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that Buzios7 Project has commenced production safely.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 68% of the sources are Center
68% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Charleston Gazette-Mail broke the news in Charleston, United States on Monday, February 17, 2025.
Sources are mostly out of (0)