Published • loading... • Updated
Closure of Alexandra Bridge to Motorists for Maintenance Work - Tva Gatineau
Summary by tvagatineau.ca
1 Articles
1 Articles
From Friday, April 17 at 7:00 p.m. to Monday, April 20 at 6:00 a.m., the bridge will be closed to motorists to allow annual spring cleaning work. The bridge will also be closed from Monday, April 20 to Wednesday, April 22 from 9:30 a.m. to 2:30 p.m. to allow inspection of the track slats towards Gatineau. Pedestrians and cyclists will continue to take the walk during all these periods of work. Also read: Night work on Highway 417, Ontario Closur…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
