From the beginning of the service (6 a.m.) on Saturday, May 9 until the end of the service (minuit) on Sunday, May 10, the Black Bridge will be closed to allow for maintenance and inspection work. No service from the Société de transport de l'Outaouais will be offered at docks 1, 2 and 3 of the Gappe station during this period. A detour is planned at the local wharf 6. Buses on lines 400 and 800 will take the highway between the Gappe station an…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
From the beginning of the service (6 a.m.) on Saturday, May 9 until the end of the service (minuit) on Sunday, May 10, the Black Bridge will be closed to allow for maintenance and inspection work. No service from the Société de transport de l'Outaouais will be offered at docks 1, 2 and 3 of the Gappe station during this period. A detour is planned at the local wharf 6. Buses on lines 400 and 800 will take the highway between the Gappe station an…