Published • loading... • Updated
Cash flow looms as Pacgold flicks switch on SA heap leach gold project
Pacgold aims to validate gold recovery from 250,000 tonnes of ore to support a low-risk production restart and generate early cash flow, leveraging a 4.6 million tonne resource.
Summary by Sydney Morning Herald
4 Articles
4 Articles
+2 Reposted by 2 other sources
Cash flow looms as Pacgold flicks switch on SA heap leach gold project
Pacgold Limited is closing in on gold production at its White Dam project after confirming plans to begin cyanide irrigation of up to 250,000 tonnes of ore shortly.
·Sydney, Australia
Read Full ArticleCoverage Details
Total News Sources4
Leaning Left2Leaning Right1Center0Last UpdatedBias Distribution67% Left
Bias Distribution
- 67% of the sources lean Left
67% Left
L 67%
R 33%
Factuality
To view factuality data please Upgrade to Premium


