British Steel secures new £35m rail supply deal
4 Articles
4 Articles
A Temporary Business Union (UTE) formed by Lantania and Sacyr will install and maintain the catenary of the second section of the High Speed Line (LAV) Madrid-Extremadura (Talayuela-Plasencia) for 35 million euros (VAT not included). Specifically, it will commission for Adif the works and the maintenance of the airline of contact and associated systems on a 70 km stretch of that high speed line, as reported by Lantania in a statement. The works …
Prime Minister unveils new £35M British Steel rail contract for Türkiye high-speed rail
British Steel has won a £35M contract to supply rail products for Türkiye’s high-speed rail network, a Downing Street statement has confirmed. The post Prime Minister unveils new £35M British Steel rail contract for Türkiye high-speed rail appeared first on New Civil Engineer.
British Steel secures new £35m rail supply deal
British Steel has secured a £35m contract to supply rail products for a high-speed network project in Turkey, strengthening its position in major international infrastructure programmes. The agreement, set to be confirmed at the G20 summit in Johannesburg, sits within a broader pipeline of UK-backed export activity worth more than £400m. The deal builds on […]
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
