2 Articles
2 Articles
All
Left
1
Center
Right
Bridge over Porur lake set to get stainless-steel barricades
The 1-metre tall constructions can be put in for 1.210 km at an estimated value of ₹29.83 lakh | Photograph Credit score: Okay. PICHUMANI Chrome steel limitations will come up on either side of the Porur bridge and the Madhavaram grade separator on the elevated Chennai Bypass. “It’s a measure for blackspot correction on each the constructions. They’re being put up on a request from the site visitors police. At Porur, the bridge passes over the l…
Coverage Details
Total News Sources2
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage