Barhale Appointed for United Utilities Storm Overflow Project in Stockport
3 Articles
3 Articles
Barhale appointed for United Utilities storm overflow project in Stockport
H2O Global News Barhale appointed for United Utilities storm overflow project in Stockport United Utilities has appointed Barhale to deliver a storm overflow reduction project at Bramhall in Stockport, as part of its Better Rivers investment programme. The civil engineering, infrastructure and tunnelling specialist will build a new detention tank at Bramhall Precinct car park to reduce how often the existing Briarlands Combined Storm Overflow op…
Barhale wins United Utilities storm overflow reduction scheme in Stockport
Barhale has been appointed to deliver a key United Utilities project to improve water quality in the Micker Brook at Bramhall, Stockport. The post Barhale wins United Utilities storm overflow reduction scheme in Stockport appeared first on New Civil Engineer.
Barhale wins UU Better Rivers project at Stockport
United Utilities has appointed Barhale to deliver a key project to improve water quality in the Micker Brook at Bramhall, Stockport. The civil engineering, infrastructure and tunnelling specialist will construct a new detention tank at Bramhall Precinct car park to reduce the number of times the storm overflow operates into the brook, a tributary of the River Mersey. The shaft tank will intercept a sewer running into the existing Briarlands Comb…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
