Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

Baie-Comeau: Work Begins on Laflèche Boulevard

Summary by lemanic.ca
From September 2 to October 3, there will be drilling work on Laflèche Boulevard, between René-Bélanger Boulevard and Rue de Bretagne, in Baie-Comeau. This work will cause an obstacle from 6 p.m. to 6 a.m., Monday to Sunday. Two out of four lanes will be closed. Traffic will be carried out on one track in each direction. Barriers can be changed or cancelled, due to operational constraints or weather conditions. Read also: Laflèche Boulevard soon…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

From September 2 to October 3, there will be drilling work on Laflèche Boulevard, between René-Bélanger Boulevard and Rue de Bretagne, in Baie-Comeau. This work will cause an obstacle from 6 p.m. to 6 a.m., Monday to Sunday. Two out of four lanes will be closed. Traffic will be carried out on one track in each direction. Barriers can be changed or cancelled, due to operational constraints or weather conditions. Read also: Laflèche Boulevard soon…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

lemanic.ca broke the news in on Tuesday, September 2, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal