Published • loading... • Updated
B. Odbayar: the Construction of a Temporary Camp and a Girder Assembly Plant for Workers to Build the Tuul Highway on the West Side of Tpp-3 Is 60 Percent Complete
Summary by ikon.mn
1 Articles
1 Articles
To begin the construction of the Tuul Highway, four workers' camps have been built on the west side of TPP-3. G. Batsaikhan, Advisor to the Mayor of Ulaanbaatar on Infrastructure and Energy, said: One main and three auxiliary sandwich camps are being built on the west side of TPP-3, in the southern part of the Tuul River, for the construction of the Tuul Highway. The bridge girders will be poured this winter. Of the 32 kilometers of technologica…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium