Published • loading... • Updated
Aztec Intersects 8.14 G/t Gold and 49.67 G/t Silver over 36.5 Metres, Including 58.5 G/t Gold and 158.0 G/t Silver over 4.6 Metres, at the Tombstone Project in Arizona
Summary by Mittelstand Cafe
1 Articles
1 Articles
Drill hole TR25-17 intersected a powerful zone of 36.5 m in a previously untested area of the northern Contention target area, averaged 8.14 g/t Au and 49.67 g/t Ag over 9.1 m, including a section of 4.6 m with an average of 58.5 g/t Au and 158.0 g/t Ag over 16.7 m. - Drill hole TR25-16 intersected
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium