Aztec Commences 5000-meter RC and Core Drilling Program at Tombstone Project, Tombstone Gold-Silver Mining District, Arizona
Summary by goldseek.com
1 Articles
1 Articles
All
Left
Center
Right
Aztec Commences 5000-meter RC and Core Drilling Program at Tombstone Project, Tombstone Gold-Silver Mining District, Arizona
Aztec Commences 5000-meter RC and Core Drilling Program at Tombstone Project, Tombstone Gold-Silver Mining District, Arizona The program is also testing, for the first time, the Carbonate Replacement Deposit style (“CRD”) sulfide potential of the project with core drilling of 3 holes drilled from RC pre-collars. Aztec Minerals Corp. Wed, 06/11/2025
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium