Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Avans Pe Secțiunea 2 a Autostrăzii A1, Care Va Lega Bucureștiul De Sibiu. Boița 1

Summary by buletin.de
Cea de-a doua gallerye a tunelului Boița 1, aflat pe Secțiunea 2 a Autostrăzii Sibiu – Pitești, a fost străpunsă duminică, 11 octombrie 2026. Aceasta are o lungime totală de 264 de metri, iar constructorii turci ai asocierii Mapa – Cengiz vor începe cămășuielile interioare, anunță Cristian Pistol. Prima gallery a cestui tunnel, cu o […] The post VIDEO | Avans pe Secțiunea 2 a Autostrăzii A1, care va lega Bucureștiul de Sibiu. A fost străpunsă a …

23 Articles

Center

The second 264-metre gallery of the Boita 1 tunnel on the Sibiu - Pitesti motorway (A1) was pierced on Sunday, announces the head of the National Road and Highway Company (CNAIR), Cristian Pistol.

·Bucharest, Romania
Read Full Article
Lean Left

A new tunnel tunnel gallery Boită 1 on the highway to be connected to Sibiul de Pitești was pierced by the Turkish builders, informs Cristian Pistol, the head of the National Road Infrastructure Management Company (CNAIR). The gallery pierced is 264 meters long and is the second pierced by the Turkish builders of the Map – Cengiz association. ...

·Romania
Read Full Article

The works at the Sibiu-Pitești Motorway (A1) advance on Section 2, Boița-Cornetu. The builders also pierced the second gallery of the Boița 1 tunnel, with a length of 264 meters, marking the completion of excavations for both galleries of this objective. The announcement was made by Cristian Pistol, the general director of the CNAIR. The first gallery of the tunnel, with a [...] Article Sibiu-Pitești Motorway: Both galleries of the Boița 1 tunne…

The work stage at Boița 1 tunnel on the Sibiu-Pitești motorway The work stage at Boița 1 tunnel on the Sibiu-Pitești motorway is approximately 45%, but on the entire Boița-Cornetu section it is only 16%, due to the lack of the revised environmental agreement. Until obtaining it, the Turkish manufacturer focuses on tunnels, viaducts, terraces and consolidation works on the sectors for which it was [...] Read the work stage at Boița 1 tunnel on th…

The works on the Boită 1 tunnel on the Sibiu-Pitești motorway are carried out in proportion to almost 45%, but on the entire Boită-Cornetu section they are only 16%, due to the lack of the revised environmental agreement. Until obtaining it, the Turkish manufacturer focuses on tunnels, viaducts, terraces and consolidation works on the sectors for which it was [...]

Read Full Article

On the site of the Sibiu – Pitești motorway (A1) was pierced and the second tunnel gallery Boită 1, with a length of 264 meters, announced the director general of the CNAIR, Cristian Pistol. The first gallery, of 247 meters, had been pierced on 20 July 2026. Although the Turkish builders of the Map – Cengiz association finished [...]

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources are Center
50% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

antena3.ro broke the news on Sunday, October 11, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal